B12 Wiener Straße, Brunn am Gebirge

11. March 2022

Project:

The entire road was closed to traffic over a length of approx. 180 metres. All installations (sewer, water, public lighting, gas pipeline, district heating, etc.) were then renovated. Finally, the entire road area (carriageway, pavements) was reconstructed.

Services:

  • Coordination of fixtures
  • §12 procedure according to Lower Austrian Road Act
  • Local road construction supervision
  • Plan for the regulation of road markings and traffic signs

FACTS

Project: B12 Wiener Straße, Brunn am Gebirge

Construction time: 10 Monate

Length: approx. 180 m